The construction of the belt conveyor stone storage tank and loading station, with the possibility of loading stone for cars and trucks in the Janina Coal Mine in Libiąż (Phase II) for the Client – TAURON WYDOBYCIE S.A.
Under the contract LINTER perform multi task modernisation project including the following works :
- ensuring the continuity of production at the time of construction through the use of mobile transport conveyors,
- construction of a new bridge and two conveyors erected on it, one of the conveyors with dumping truck ensuring distribution of the material on the storage yard,
- modernization of chutes,
- construction of transfer points,
- execution of technical infrastructure (central heating systems, installation of potable water and fire protection, sanitary sewage system, power and control system, squares and roads).
Estimated date of commissioning phase is planned for February 2018.