Transport of waste for floatation processing plant – Mining and Processing Plant ZGH “Bolesław” S.A . in Bukowno

Under the EPC formula LINTER is responsible for the following scope of works :

  • Execution of design engineering works for the following branches : construction, mechanical and electrical for the following range:
    – transport of material to the loading station,
    – transport of concentrated waste from flotation process
  • Execution of technical electrical design of electric power supply system for the transport of material and transport of concentrated waste for flotation including :
    – transformer – distribution station 30 / 0,5kV,
    – cable route for the transport of material with the selection of cables and cable laying route,
    – cable route for the transport of concentrated waste from floatation process with the selection of cables and cable laying routes,
    – switchgears 500V and 400 / 230V to power auxiliary equipment,
    – installation of lighting system and earthing protection system,
  • Execution, delivery, assembly, installation and commissioning of complete conveyor systems in all branches.

Expected date of commissioning is planned for December 2016