Realisations

Our presence in the domestic market for years and development of business activity in the international market, numerous completed projects have allowed us to strengthen our position as:

Z

a renowned designer

Z

a supplier of equipment and machine components

Z

a provider of specialised services

for our long-term partners – the leading companies in the mining industry and other industries (cement, chemical and energy sectors).

Below there are some of our business partners:

Below there is a selection of our projects :

Examples of projects - mining services provided by Linter Mining Sp. z o.o.
No Ordering Party Scope of order Date of accomplishment
 1  JSW S.A. KWK “Borynia-Zofiówka-Jastrzębie” – Ruch “Borynia”, Ruch “Zofiówka” Provision of comprehensive services and maintenance for transportation facilities (haulage) at 713 m, 838 m and 950 m in JSW S.A. KWK “Borynia-Zofiówka-Jastrzębie” Ruch Borynia and at 900 m in Ruch Zofiówka.  2011 – 2015
2  JSW S.A. KWK Pniówek Provision of services for belt conveyors within main underground transportation facilities (haulage), along with traffic control and maintenance. 2014 – 2016
3  JSW S.A. KWK “Borynia-Zofiówka-Jastrzębie” – Ruch “Borynia” Provision of comprehensive services and maintenance for transportation facilities (haulage) at 838 m and 950 m. 2010 – 2011
4  Tauron Wydobycie S.A. – Zakład Górniczy Sobieski Tunnelling (drifts) to provide access to Deposit 118 in Południowy Koncern Węglowy S.A. – Zakład Górniczy Sobieski in Jaworzno. Length – 940 m, by means of a multi-purpose machine and road header (KTW-200). The company did the tunnelling using its own machinery and equipment. 2010 – 2011
5 JSW S.A. KWK “Borynia-Zofiówka-Jastrzębie” – Ruch “Borynia” Tunnelling with the use of explosives at 395 m of Crosscut belt-conveyed tunnel C-30 2011 – 2012
6  Tauron Wydobycie S.A. – Zakład Górniczy Sobieski Tunnelling (transport and haulage drifts) using a road-header within Deposit 304/2. The company tunnelled 1755 m by means of a road-header and its own machines and equipment. 2012
7  Tauron Wydobycie S.A. – Zakład Górniczy Sobieski Tunnelling (preparatory drifts) by means of a road-header at 500 m within Deposit 207 and 209. 2012 – 2015
8  JSW S.A. KWK “Borynia-Zofiówka-Jastrzębie” – Ruch “Borynia” Tunnelling of G-31 drift and G-31 rising gallery within Deposit 358/2. 2012 – 2014
9  Tauron Wydobycie S.A. – Zakład Górniczy Sobieski Tunnelling (facilitating and preparatory drifts) at 500 m within Deposit 304/2 in Południowy Koncern Węglowy S.A. – Zakład Górniczy Sobieski in Jaworzno. 2013 – 2014
10  Tauron Wydobycie S.A. – Zakład Górniczy Janina w Libiążu Tunnelling (stone drifts) in Południowy Koncern Węglowy S.A. – Zakład Górniczy Janina in Libiąż 2013 – 2014
11 KHW S.A. KWK “Wujek” Ruch “Śląsk” Execution of mining works – tunnelling a cross-heading to Section “J” and Middle drift “J” 2013 – 2015

 

Examples of projects - mining services provided by PRG Linter S.A.
No. Ordering Party Scope of order Date of accomplishment
1 Lubelski Węgiel Bogdanka w Bogdance S.A. Mining operations at Field 4, Deposit 385 – Bogdanka area 2010 – 2015
2 Lubelski Węgiel Bogdanka w Bogdance S.A. cross-heading NE (tunnelling) 2013
3 Lubelski Węgiel Bogdanka w Bogdance S.A. Provision of services to strengthen choc-support structures in drifts and the rock mass 2012 – 2013
4 Lubelski Węgiel Bogdanka w Bogdance S.A. Execution of mining works at Position 960 aimed to reconstruct Water passageway no. 2 2013 -2015
5 Lubelski Węgiel Bogdanka w Bogdance S.A. Maintenance of transport routes for suspended cable cars built-up in mining drifts 2013
6 Lubelski Węgiel Bogdanka w Bogdance S.A. Strengthening choc-support structures 2014
7 Lubelski Węgiel Bogdanka w Bogdance S.A. Maintenance of transport routes for suspended cable cars built-up in mining drifts 2014
Design works and supply of transport systems
No. Ordering Party Scope of order Date of accomplishment
1 JSW S.A.
KWK Zofiówka
Modernisation of a conveyor belt with a belt width of 1200 mm.
Supply with accessories and construction of a factory-new conveyor with a belt width of 1200 mm
2013 – 2015
2 KW S.A. KWK Ziemowit Supply of 4 belt conveyors with a belt width of 1000 mm and power over 200 kW 2013
3 LW Bogdanka Supply and start-up of a factory-new belt conveyor with a width of 1200 mm and length of 2380 m, with indirect power drive and facilities for belt pull-in. 2012
4 LW Bogdanka Supply of 4 factory-new belt conveyors with a belt width of 1000 mm and length of 1850 m each with facilities for belt pull-in and pull-out. 2012
5 JSW S.A.
KWK Borynia-Zofiówka Ruch Borynia
Supply and installation of 3 factory-new belt conveyors with a belt width of 1200 mm and capacity 1100 Mg/h – INTERMET 1200 type 2012
6 TAURON WYDOBYCIE ZG Sobieski Supply and installation of a new belt conveyor with a belt width 1400 mm, length of 1280 and drive power of 4x355kW. 2011
7 Górażdże Kruszywa Sp. z o.o. Heildelberg GROUP Manufacture and supply of 2 route structures for belt conveyors with a belt width (B) of 800 mm, length of 300 m and supply of 2 new complete belt conveyors with a belt width (B) of 800 mm and length of 300 m. 2013
8 Grupa Azoty
Zakłady Azotowe  Puławy  S.A.
Supply, installation and supervision of start-up of 3 complete belt feeders and 1 bowl feeder 2014  – 2015
9 Alstom Power Sp. z.o. o. Modernisation of the coal feeding system – Bełchatów Power Station – Block 858 MW 2011-2012
Design works and supply of machines for processing plants and equipment for dense liquid separation of minerals
No. Ordering Party Scope of order Date of accomplishment
1 Południowy Koncern Węglowy S.A. Zakład Górniczy Janina Construction of haulage and loading facilities of “Jaret” assortment for Południowy Koncern Węglowy S.A. – Zakład Górniczy Janina in Libiąż 2009
2 JSW S.A. KWK Borynia-Zofiówka Ruch Zofiówka Modernisation of the coal preparation station for Zakład Przeróbki Mechanicznej Węgla KWK Zofiówka 2009 – 2010
3 KOMPANIA WĘGLOWA S.A.
KWK Ziemowit
Reconstruction of the preliminary classification at the Preparatory Station I – preliminary fine sifting 0-20 mm  2012 – 2013
4 Katowicki Holding Węglowy S.A.
KWK Mysłowice Wesoła
Modernisation of loading facilities of (cobble) blocks for ZPMW KWK Mysłowice Wesoła   2011- 2013
5 Kompania Węglowa S.A.
KWK Knurów -Szczygłowice
Modernisation of the dense liquid separation node for ZPMW KWK “Knurów-Szczygłowice” Ruch Knurów  2013-2014
6 LW Bogdanka klient
MIFAMA Sp. zo.o.
Supply of 3 dense liquid separators (DISA 2S 3200) 2014
7 Kompania Węglowa S.A.
KWK Brzeszcze
Modernisation of the dense liquid separation node for Zakład Przeróbki Mechanicznej Węgla KWK Brzeszcze 2014
8 Katowicki Holding Węglowy S.A.
KWK Mysłowice Wesoła
Modernisation of the water and sludge circulation system for KWK Mysłowice Wesoła – supply of filter presses 2015-2016
Execution of steel structures
No. Ordering Party Scope of order Date of accomplis
 1 Górażdże Kruszywa Sp. z o.o.
Heidelberg Cement Group
Execution of route structures for belt conveyors with a belt width (B) of 800 mm and length of 300 m. 2013
2  SKANSKA S.A. oddział EXBUD Kielce Supply of building structures – hall and plant elements

Steel construction of building grids and beams for roof installation – “Dominikański” Building in Wrocław

Construction of building braces for MPL Airport in Pyrzowice with a total roof area of 9000 m2

Construction of bar-tacking for TRIMO panels, fire-protected, for Philip Morris in Kraków, with a total roof area of ​​10000 m2

2014 – 2015
3  Uniserv – Piecbud S.A. Execution of construction elements for cooling towers.  2015
4 KGHM Zanam Legmet S.A. Execution of external steel blinds with corrosion protection, steel structures of the cooling chamber and its inlet funnel.  2015
5  PCC Rokita S.A. Prefabrication, supply and erection of supporting structures for ventilation units and wall fans.  2016

 

Selected projects - foreign markets
No. Market Scope of supply Date of accomplishment
1 Germany, Estonia, Morocco Supply of belt conveyors and their components 2012 – 2016
2 France, Morocco, Germany, Estonia, Hungary, Austria, Latvia, Belgium, Argentina, Russia Supply of rollers provided by MET-ROLL Sp. z o.o. 2010-2016
3 Estonia Supply of filter presses 2011
4 Morocco Supply of electric meters 2011-2012
5 Turkey Supply of mining fans, de-dusting units for the mining industry 2014-2016